JetStream Operational Optimizer
Data-driven operational intelligence for high-pressure waterjetting. Optimize your hydro-excavation estimates and system pressure calculations.
ProFit-Jet Hydro-Excavation Estimator
Asset Configuration
Economic Inputs (Optional)
Job Scorecard
Base Volume:0.00 CY
Expanded Volume:0.00 CY
Water Needed:0 gal
Slurry Weight:0 lbs
Trips to Dump:0
Excavation Time:0.0 hrs
Total Job Time:0.0 hrs
Soil Dynamics Info
Type: Sticky Clay
Bulking Factor: 1.4x
Water Usage: ~600 gal/CY
Removal Rate: ~35 CY/hr
Cohesive, requires high-pressure fracturing